Projects - Highland Terrace Outfall RepairProblemCollected stormwater runoff was causing severe erosion at the end of a stormwater outfall pipe on Highland Terrace. Erosion undermines the stability of the soil around the outfall pipe and caused stormwater runoff to transport excess sediment to the stream. DescriptionA stone splash pad was installed at the end of the outfall pipe to prevent scour. A rock-lined swale with stone check dams were installed to stabilize the soil in the channel and slow the flow of water enough to prevent future erosion. The surrounding area was reshaped, seeded and mulched to prevent further failure of the nearby bank.BenefitSediment loading to Muddy Brook will be reduced. The bank along Highland Terrace has been stabilized. This project will prevent future damage to City stormwater drainage infrastructure and nearby private property.Dates/TimelineSummer 2009Best Management PracticesStone-lined channel, stone check damTotal Project Value~$4,000Funding SourcesStormwater Utility Fund |


